SAP PM - Plant Maintenance

SAP PM (Plant Maintenance) plans, executes and records the maintenance of technical assets across your plants. In S/4HANA it sits under Asset Management as Maintenance Management; the core objects stay the same, while the phase model, a scheduling board and a new permit to work solution were added.

Part of these processes

Connected modules

Process

From breakdown to settlement in SAP PM

Corrective maintenance starts with a breakdown notification; in preventive maintenance, work goes from the plan straight to order planning.

  1. 01NotificationIW21 · M1 · M2

    Fault, priority, downtime

  2. 02Order planningIW31 · F4604

    Labor, parts, services

  3. 03Approval and releaseREL · work permit

    Budget, authority, safety

  4. 04ExecutionF5104A · mobile

    Parts issued, findings logged

  5. 05ConfirmationIW41 · F3925

    Time, damage and cause codes

  6. 06CompletionTECO · KO88

    Cost center, WBS or asset

Flow

The preventive maintenance chain

Time-based and counter-based work appears on its own only as long as the mass scheduling job runs regularly.

  1. 01
    Task listOperations, parts, durationsIA01 · IA05
  2. 02
    StrategyPackages and cyclesIP11
  3. 03
    Maintenance planCycle, strategy or counterIP41 · IP42 · IP43
  4. 04
    Mass schedulingDue calls are generatedIP30H · F2774
  5. 05
    Call objectOrder or notification
  6. 06
    Execute, confirmSame steps as a breakdown
  7. 07
    Counter readingMoves the next due dateIK11

The call object can also be a service entry sheet. Plans that need no strategy skip it.

Scope

What we design in maintenance projects

Current state

SAP PM in S/4HANA: Maintenance Management

  • Since the 2021 release, maintenance requests and orders can pass through nine phases. The phase model works with specific order types; the classic process without phases remains valid.
  • IP30H, optimized for HANA and running in parallel, is recommended in place of IP30; use IW37N and IW49N instead of IW37 and IW49. Mobile Asset Management (MAM) does not exist in S/4HANA.
  • Fiori-based Permit to Work arrived with 2022 FPS02. According to SAP it does not replace classic WCM; it is a separate solution, and classic WCM continues in SAP GUI under its own license.
  • On-premise rights to the LIS-based maintenance reports ended in late May 2026; RISE keeps maintenance LIS to end-2033 (SAP Note 2269324). F2812, F3567 and F4603 cover failures and costs.

Localization

Work equipment rules, capitalization

  • Periodic checks and EKİPNET

    Annex III lifting gear, pressure vessels and electrical installations are checked by competent persons registered in EKİPNET. We map this to classes, plans and services.

  • Reports and re-inspection

    Results are kept with a wet or secure electronic signature, and the report is attached to the equipment. The check is repeated after major maintenance or repair.

  • Expense or investment

    Tax Procedure Law art. 272 capitalizes lasting value increases on real estate or power generation and distribution assets; routine maintenance and repair are excluded.

From the field

Notes from the field on SAP PM projects

FAQ

SAP PM: questions we hear

What is SAP PM, and why is it named differently in S/4HANA?

It is the SAP component that plans and executes the maintenance of technical assets. In S/4HANA it is called Maintenance Management, under the Asset Management line of business. Functional locations, equipment, notifications, orders and plans stayed the same; the phase model, Fiori apps and the new permit to work solution came with S/4HANA.

How does preventive work get created automatically?

A task list, with a maintenance strategy if needed, is assigned to a maintenance plan that is scheduled by time or by counter. As long as the mass scheduling job (IP30H or F2774) runs regularly, work that reaches the call horizon produces a notification, a maintenance order or a service entry sheet. If the job stops, so does the plan.

What separates a notification from a maintenance order?

The notification records what happened: fault, damage, cause, downtime. The order plans what will be done and collects the cost: operations, labor, parts and services. In SAP the breakdown type is the malfunction report (M2), and breakdown itself is a separate indicator. In the phase model a notification is first screened as a maintenance request.

How are spare parts linked to a maintenance order?

Stocked parts get a reservation, and the goods issue is posted against it. Non-stock parts and external services create a purchase requisition that becomes an order in SAP MM. Because the planner can follow the material status on the order, the job can be scheduled once the parts are ready.

How does SAP handle work permits and lockout-tagout?

There are two options: classic Work Clearance Management in SAP GUI, or Fiori-based Permit to Work from S/4HANA 2022 FPS02. In the latter, a work permit can reference a maintenance order, and safety and isolation certificates are included. Permit to Work is not a new version of WCM but a separate solution, and it reached Cloud Public Edition with release 2602.

How are statutory equipment checks tracked in SAP PM?

Equipment covered by the Turkish regulation on the safe use of work equipment is flagged through classification, and the check interval is tracked with a maintenance plan. The competent person registered in EKİPNET joins the order as an external service; the contract is set up in İSG-KATİP at least one day before the work. The signed report is attached to the equipment.

Sources12 sourcesSAP Help Portal, Mevzuat Bilgi Sistemi, SAP Support

SAP Consulting

Plan a first call about your maintenance setup

Tell us how your technical objects and preventive plans are set up today.

Quick access

SAP module consulting

We provide consulting across SAP modules, from finance to manufacturing and from integration to data.

Looking for the right consultant?Find an Expert SAP Consultant
Finance8
Human resources3
Logistics11
Manufacturing7
Projects and engineering2
Platform and development4
Integration2
Data and control3