
01SAP TRANSFORMATION
SAP S/4HANA Consulting
Choose the Right S/4HANA Deployment Model with Us
Cloud or on premise, we run your move to SAP S/4HANA as a business programme with a schedule, budget and success criteria agreed at the start.
- Model 01SAP S/4HANA TransitionBrownfield · Greenfield · SelectiveMoving from an existing ECC system to SAP S/4HANA: the choice of approach, technical preparation and project delivery.Go to section
- Model 02SAP S/4HANA Cloud Public EditionMulti-tenant cloud ERPFast and predictable with standard processes; SAP takes care of infrastructure, releases and maintenance.Go to section
- Model 03SAP S/4HANA Cloud Private EditionRISE with SAPA transformation programme that brings software, infrastructure, process analysis and transition services into one subscription.Go to section
MODEL 01 · TRANSITION
SAP S/4HANA Transition
The choice of approach, technical preparation and project delivery for a move from ECC to SAP S/4HANA.
Most organisations moving to SAP S/4HANA do not start from scratch; they bring along an SAP ECC system that has run for years, carries custom developments and holds a long data history. The real subject of the project is therefore not the new system itself, but how much of the old one comes along.
There are three routes for that decision: brownfield (in SAP’s terms, system conversion), greenfield (new implementation) and selective (selective data transition). Each carries a different duration, cost and risk; the wrong choice either drags the project out or carries technical debt into the new system for years. We make the decision with the SAP Readiness Check results, a custom code inventory and a process map, and then run the project end to end, from preparation to go-live.
In all three routes the destination is SAP S/4HANA: on premise or as SAP S/4HANA Cloud Private Edition (new name: SAP Cloud ERP Private). SAP S/4HANA Cloud Public Edition (new name: SAP Cloud ERP) can only be reached with a greenfield implementation.
Where to start?
Every transition starts by measuring the current system: the SAP Readiness Check report, a simplification item scan and a custom code inventory. Without these three, durations and budgets are guesses.
One decision, three routes
The destination is the same; the data that moves, the processes that change and the project duration differ from start to finish.
- BrownfieldSystem ConversionConverted in place; data stays where it is
- GreenfieldNew ImplementationBuilt from scratch; master data and balances move
- SelectiveSelective Data TransitionSelected company codes and periods move
How much of the current system comes along?
Discussing timelines and budgets before the route is decided turns into a scope debate later in the project.
Approach 01
BrownfieldSystem Conversion
The existing system is converted in place. SUM runs the release upgrade, the database migration with DMO if the database is not SAP HANA, and the conversion to the new data model in one procedure.
- Historical data, open items and document numbers stay in place
- Organisational structure and company codes are kept
- The route with the lowest change load for users
- Unused custom code comes along too, which is why code clean-up happens before the conversion
- Process improvement is planned as a separate piece of work
Best suited to: Organisations happy with their processes that want to keep their data history and are short on time before 2027.
Approach 02
GreenfieldNew Implementation
The system is built from scratch with SAP’s standard process content. Old configuration is not inherited; only the master data and open balances that are needed move.
- A clean break from customisations that piled up over the years
- A move to standard processes and a clean data model
- The chance to set up clean core from day one
- Historical data does not move; it stays in an archive or in the old system, kept read-only
- The route with the highest change management and training load
Best suited to: Organisations that want to redesign their processes, have been through a merger or split, or whose current system has become overly complex.
Approach 03
SelectiveSelective Data Transition
The middle ground. Which company codes, processes and how many years of data move is chosen item by item; it needs specialist tools and methods and runs as a separate stream of work.
- Critical data moves, what is not needed stays behind
- A phased go-live by company code is possible
- Process improvement and data continuity together
- Planning and analysis demand the most careful work
- Specialist tools and services add to the project cost
Best suited to: Multi-company, multi-country groups that want to simplify some units and move others as they are.
A phased fourth option
- Alongside the three routes there is a phased option: with SAP Central Finance, the group’s financial postings first come together in one SAP S/4HANA system while each company keeps working in its own ERP.
The transition in four phases
Whatever the route, every transition goes through the same four phases; what changes is the weight and length of each.
Phase 01
Assessment
The phase where the current system is measured and the route is chosen.
- SAP Readiness Check analysis
- Simplification item scan
- Custom code and add-on inventory
- Route decision and business case
Phase 02
Planning
The phase where scope, teams and risks become clear.
- Project plan and milestones
- Resource and role plan
- Risk analysis and downtime strategy
- Test and training approach
Phase 03
Conversion
The busiest phase, where the technical and functional work is done.
- CVI and custom code remediation
- SUM and DMO rehearsal runs
- Data migration and reconciliation
- Integration and acceptance testing
Phase 04
Go-live
The phase where cutover happens and the system settles into routine.
- Executing the cutover plan
- End-user training
- Hypercare period
- Handover to the AMS support model
Sample timeline: brownfield (12 months)
The critical path runs through CVI and custom code remediation: until both are finished, a rehearsal conversion on a production copy gives no meaningful result.
- Readiness Check and SI-CheckMonths 1-2
- CVI: move to business partnerMonths 2-6 · critical path
- Custom code remediationMonths 3-7 · critical path
- Sandbox conversionMonths 4-5 · downtime measured for the first time
- DEV and QAS conversionMonths 6-8
- Test cycles (SIT, UAT)Months 8-10
- Rehearsal conversionsMonths 8-11 · on a production copy, at least two full runs
- Go-live and hypercareMonth 12
- 1CVI and custom code closed, rehearsals start (Month 7)
- 2Go-live (Month 11)
Sample timeline; duration depends on data volume, custom code size and integrations.
Sample timeline: greenfield (18 months)
The weight lies not in technical conversion but in process design and user adoption. Data preparation starts early; cleaning the master data that will move is the project’s longest tail.
- Discovery and target designMonths 1-4
- Fit-to-Standard workshopsMonths 3-8
- Data preparation and clean-upMonths 4-12 · critical path
- Configuration and developmentMonths 6-13
- Data load rehearsalsMonths 10-15
- Test cycles (SIT, UAT)Months 12-17
- Training and user adoptionMonths 13-18
- Go-live and hypercareMonths 17-18
- 1Target process design approved (Month 4)
- 2Fit-to-Standard outcomes closed (Month 8)
- 3First full data load rehearsal (Month 13)
- 4Go-live (Month 17)
Sample timeline; SAP gives an indicative 15-21 months for a single-wave greenfield implementation.
Eight items to close before a brownfield conversion
What delays a brownfield conversion is usually not the SUM run itself but the preparation before it. Some items stop the tool technically and some do not; every item that is skipped comes back during the rehearsal conversions.
SAP Readiness Check
The current system’s readiness report for SAP S/4HANA: affected functions, custom code volume, data size and add-on compatibility. The project plan is built on this report.
RecommendedSimplification item check (SI-Check)
Runs twice inside SUM: at the start and just before downtime. Findings with return code 7 can be exempted once confirmed; return code 8 or higher must be resolved before downtime (SAP Note 2399707).
RequiredCVI: move to business partner
Customer and supplier master data move to the business partner model; this is a prerequisite for the conversion (SAP Note 2265093). In our experience on projects, this is where the most time is lost.
Required · before SUMCustom code analysis (ATC)
The ABAP Test Cockpit checks Z code for compatibility; it does not stop SUM. The real gain is in elimination: retiring unused developments shrinks the code that needs fixing.
RecommendedData volume and archiving
Archiving old documents and cleaning up technical tables cuts conversion time, the downtime window and storage costs in the cloud.
RecommendedAdd-on and third-party compatibility
Every add-on needs a conversion path to the target release; supported add-ons are listed in SAP Note 2214409. A single add-on without a path stops the conversion.
RequiredMaintenance Planner
Checks components, add-ons and business functions; if there is no valid path it does not allow the conversion, otherwise it generates the stack file for the target release.
RequiredSUM and DMO run
The release upgrade, database migration and conversion to the SAP S/4HANA data model run in one procedure. Before production we run at least two full rehearsals; downtime only becomes predictable once it has been measured in a rehearsal.
Required
Keeping master data clean
- Business partner data cleaned up for CVI does not stay clean on its own after go-live. SAP recommends switching on SAP MDG central governance before or at go-live; from then on, new and changed records are distributed only after approval.
ECC maintenance timeline
For organisations that keep postponing the decision, the real constraint is the calendar rather than the budget; with the average transition taking a year and a half, the window is narrower than it looks.
- EHP 5 and below: mainstream endedMoved to customer-specific maintenance
- EHP 6-8: end of mainstreamStandard maintenance for SAP ERP 6.0
- End of extended maintenancePaid; two points on the maintenance base
- End of the transition optionSelected large RISE customers, 2031-2033
- S/4HANA commitmentAt least one release maintained until 2040
ECC after 2030
- SAP ERP, private edition, transition option is only for the largest and most complex RISE with SAP customers: the system must move to SAP ERP, private edition on SAP HANA before the end of 2030, be at least 2 TB in size and come with the max success plan.
- According to SAP’s October 2026 announcement, database-specific support for SAP Business Suite 7 systems on third-party databases ends at the end of 2030; after that, these systems can only move with a greenfield implementation.
What the transition changes in practice
A move to SAP S/4HANA changes four things in day-to-day work.
One accounting table
Line items from the general ledger, profit centres, fixed assets, the Material Ledger and controlling meet in one table, the Universal Journal (ACDOCA), so there is less reconciliation between ledgers.
Real-time reporting
Reports read transaction data directly instead of totals tables, so current figures are available without waiting for overnight batch jobs.
Role-based SAP Fiori
Users work with apps assigned to their business role instead of memorising transaction codes; approval flows come as standard.
A smaller data footprint
With totals and index tables gone, data volume shrinks; in the cloud that is a direct cost item.
MODEL 02 · PUBLIC EDITION
SAP S/4HANA Cloud Public Edition
A fast, predictable cloud ERP model with standard processes, operated by SAP.
SAP S/4HANA Cloud Public Edition (SAP Cloud ERP) is a multi-tenant cloud ERP operated by SAP and licensed by subscription. Every customer runs the same software release on shared infrastructure, while each customer’s data and configuration stay separate in its own tenant.
The system comes with processes preconfigured through SAP Best Practices, so companies go live on proven processes without long analysis and design phases. SAP runs the infrastructure, backups, security patches and the two releases a year (February and August); configuration and release testing stay with the customer. SAP chooses the infrastructure provider, and the customer picks the data centre region.
The guiding principle is Fit-to-Standard: the process adapts to the system rather than the system being rewritten around the process. Specific needs are met in an extension layer without touching the core, so no pile of custom code builds up that needs fixing after every release.
Who is it for?
Companies ready to work with standard processes and few custom developments, and organisations starting from scratch. SAP positions GROW with SAP (new name: SAP GROW) for midsize companies, yet large, multi-country projects run on the public edition too. The only route to this edition is a greenfield implementation.
Shared code line, separate data
The same SAP release runs for every customer; customisation moves to the extension layer and the core stays clean.
- 01
Tenants
- Each customer's data in its own tenant
- Configuration specific to the tenant
- 02
One shared code line
- Same release for every customer
- Major releases in February and August
- 03
Extension layer
- Key user tools
- ABAP Cloud (three-system landscape)
- Side-by-side apps on SAP BTP
- 04
Infrastructure and operations: SAP
- Hosting, backups and security patches
- Customer picks the region, SAP the infrastructure
- Planned releasesTwo major releases a year (February, August) with monthly hotfix collections in between; a four-week test period before each major release.
- Fast deploymentAccording to SAP, most projects go live in 5-7 months; fixed-scope SAP GROW Fast projects in 2-4 months.
- Predictable costA subscription model with a lower upfront investment than an on-premise installation.
- Infrastructure run by SAPHosting, backups, security patches and disaster recovery are with SAP.
- Ready processes and localisationProcesses preconfigured with SAP Best Practices; SAP provides ready localisation for 60 countries and regions.
- Three ways to extendKey user tools, developer extensibility with ABAP Cloud (in a three-system landscape) and side-by-side apps on SAP BTP.
End-to-end processes on one platform
The public edition is an integrated set of processes, from finance to manufacturing, running on one data model.
Financial management
General ledger, period-end close, cost centre and profit centre accounting, asset accounting and group reporting.
Sales
Order management, pricing, delivery and billing.
Sourcing and procurement
From requisition to purchase order, from invoice processing to inventory and warehouse management.
Manufacturing and asset management
Production planning, MRP and quality management; maintenance management sits under asset management.
Human resources
The public edition is not an HR solution; workforce data comes from SAP SuccessFactors Employee Central through SAP Master Data Integration.
Sustainability
Integrates with SAP Green Ledger for carbon accounting and SAP Sustainability Footprint Management for product footprints; both are separate products.
GROW WITH SAP
A fast-track package for the midmarket
GROW with SAP (SAP GROW) turns the move to the public edition into a packaged programme. According to SAP, a technical go-live can happen within four to six weeks; taking processes live for the business takes longer, depending on scope and data readiness. In early 2026 SAP introduced SAP GROW Fast, a fixed-scope approach, and says implementation costs in these projects are up to 40 percent lower than in conventional ERP projects.
- Accelerated SAP ActivateA proven implementation framework and a predictable go-live calendar.
- Ready process contentPreconfigured business scenarios and sample data for many industries.
- SAP BTP and learning resourcesSAP BTP and SAP Build for extensions; learning resources and the community for key users and the team.
Sample timeline: greenfield on the public edition (6 months)
A sample timeline for a single-country, medium-scope implementation. The analysis phase is short; the discussion is not about how to code the process but where the standard process does not fit.
- Discovery and preparationMonth 1 · Discover, Prepare: scope, team, trial system
- Fit-to-Standard workshopsMonths 2-3 · Explore: delta list, extension needs
- Configuration, integration and testingMonths 3-5 · Realize: data load rehearsals
- Go-live and hypercareMonth 6 · Deploy (including hypercare), then Run: handover to AMS
- 1Scope and project plan approved (Month 1)
- 2Delta list closed (Month 3)
- 3Go-live (Month 5)
Sample timeline. According to SAP, most public edition projects take 5-7 months; duration depends on the number of company codes, integrations and data quality.
The public edition in four phases
Phase 01
Discovery and preparation
A short phase where scope and teams become clear and the system is opened.
- Gathering business requirements
- Initial mapping to SAP Best Practices scope
- Opening the trial system
- Project plan, team and decision rules
Phase 02
Fit-to-Standard
The phase where the standard process is shown live and the gaps are written down.
- Process-based workshops
- Delta list and solution decisions
- Identifying extension needs
- Defining integration and data scope
Phase 03
Configuration and testing
The phase where decisions are built into the system and verified.
- Fit-to-Standard configuration
- SAP BTP extensions and integrations
- Data migration rehearsals and reconciliation
- Unit, integration and acceptance testing
Phase 04
Go-live
The phase where cutover runs and the system settles into routine.
- Final data load and cutover
- End-user training
- Hypercare
- Handover to the AMS support model
Two releases a year: the 2026 calendar
On the public edition an upgrade is not a project but a routine with a calendar known in advance. A release reaches the test system first, the organisation runs regression tests in a four-week window, and then the development and production systems are upgraded.
- Release 2602Test 17-18 January, production 14-15 February
- Release 2608Test 18-19 July, production 15-16 August
- Hotfix collections (HFC)All year · monthly; after a one-week preview
- 12602 in production (Month 1.45)
- 22608 in production (Month 7.45)
Planned dates for the next release, 2702: test systems on 16-17 January 2027, development and production systems on 13-14 February 2027. Dates are from SAP's published schedule; SAP may change the plan.
MODEL 03 · PRIVATE EDITION
SAP S/4HANA Cloud Private Edition
RISE with SAP
A cloud transformation programme that brings software, infrastructure, process analysis and transition services into one contract.
RISE with SAP is a buying and transformation model that brings licences, hosting, maintenance, process analysis tools and transition services into one subscription commitment. At its centre is SAP S/4HANA Cloud Private Edition (SAP Cloud ERP Private): a single-tenant system dedicated to one organisation.
Alongside the core, the RISE with SAP package as renewed by SAP in 2025 includes SAP Signavio and SAP LeanIX capabilities, SAP Build, SAP HANA Cloud, SAP Master Data Governance and SAP Business Network Supplier Portal; package contents vary by contract. The system runs in an SAP data centre, on AWS, Microsoft Azure or Google Cloud, or under the customer data centre option, and in every case SAP operates it.
The end of mainstream maintenance for SAP ECC at the close of 2027 has turned this decision into an agenda item with a fixed date for most organisations. We take part in every step of the programme, from readiness analysis and target architecture to the transition and improvement after go-live.
Who is it for?
Mid-sized and large organisations that want to keep their ECC investment and custom developments but do not want to run the infrastructure themselves. It also suits companies that want licences, infrastructure and maintenance under one budget line.
One contract, four components
The ERP core, the extension platform, process analysis and the supplier network, on the infrastructure of your choice.
- 01
SAP S/4HANA Cloud Private Edition
- Single-tenant ERP core
- Classic ABAP and industry processes
- 02
Capabilities in the package
- SAP BTP: SAP Build, SAP HANA Cloud
- SAP Signavio and SAP LeanIX
- SAP Business Network Supplier Portal
- 03
Infrastructure choice: SAP operates
- SAP data centre
- AWS, Microsoft Azure, Google Cloud
- Customer data centre
Four components inside the contract
Each component covers its own capability area; together they form one structure that reaches from the ERP core to the supplier network.
SAP S/4HANA Cloud Private Edition
The programme’s ERP core. Its single-tenant set-up means classic ABAP developments and industry-specific process design can be kept.
- A single-tenant environment for one organisation
- Custom developments can move across
- The customer decides when to upgrade
- Local legal compliance packages
SAP Signavio
Measures processes with real transaction data from the system, not assumptions; it makes bottlenecks visible before the transition and improvement visible after it.
- Process mining and flow analysis
- Industry benchmark data
- Spotting deviations from the standard
- Process monitoring after the transition
SAP BTP
The way to keep the core clean. Specific needs are built in a separate layer on the platform instead of being embedded in the ERP.
- Side-by-side application development
- Low-code solutions with SAP Build
- A data layer with SAP HANA Cloud
- Master data with SAP Master Data Governance
SAP Business Network
The digital connection layer with suppliers and trading partners; it puts document exchange on a standard footing.
- Supplier portal and order flow
- Electronic document exchange
- Tracking order and invoice status
- A shared data model on the network
INFRASTRUCTURE CHOICE
The infrastructure decision stays with you
The choice weighs the current cloud strategy, data residency requirements, regional reach and the cost model together. Whichever infrastructure is chosen, SAP operates the system; we run this assessment independently.
- Amazon Web ServicesA wide regional network and a mature service portfolio; one provider for organisations already running workloads on AWS.
- Microsoft AzureA natural choice for organisations working in the Microsoft ecosystem. Single sign-on with Entra ID is set up through SAP Cloud Identity Services and does not depend on the infrastructure.
- Google CloudFor data and analytics-heavy organisations. SAP Business Data Cloud Connect for BigQuery connects SAP data to BigQuery regardless of where the ERP runs.
- SAP data centresWhen one point of contact is preferred; infrastructure and application operations under one roof.
- Customer data centreFor organisations bound by data residency; the system runs in the organisation’s own data centre on Dell, HPE or Lenovo hardware.
- One budget lineLicences, infrastructure, maintenance and core services in one contract.
- Ready for 2027A planned, controlled move before ECC mainstream maintenance ends.
- Measurable processesSAP Signavio finds bottlenecks with real data and tracks improvement.
- Planned innovationA major release every two years with feature packs every six months; the customer plans upgrades, SAP does the technical work, and one upgrade a year can be requested.
- Security and complianceCertification, access management and data protection are covered at the infrastructure layer.
- Flexible scalingUser numbers, scope and capacity adjust as the business grows.
A 12-month sample transition with SAP Activate
A sample plan for a mid-sized RISE with SAP transition. Each phase closes with a quality gate; some work is prepared in the preceding phase, for example cutover is planned in Realize and executed in Deploy.
- Preparation and assessmentMonths 1-3 · Discover, Prepare: Readiness Check, infrastructure and route decision
- Analysis and target designMonths 3-6 · Explore: Fit-to-Standard, delta list, SAP BTP architecture
- Realisation and testingMonths 5-10 · Realize: conversion rehearsals, data, integration, acceptance testing
- Go-live and hypercareMonths 10-12 · Deploy (including hypercare), then Run: handover to AMS
- 1Readiness Check and route decision (Month 3)
- 2Target design approved (Month 6)
- 3Acceptance testing complete (Month 9)
- 4Hypercare closes, handover to AMS (Month 12)
Sample timeline; duration depends on scope, the number of company codes and the chosen transition route.
SAP Activate's six phases in four steps
Phase 01
Preparation and assessment
The phase where the current state is put into numbers and decisions are made.
- SAP Readiness Check analysis
- Custom code and add-on inventory
- Interface and integration map
- Infrastructure and route decision
- Roadmap, team and budget plan
Phase 02
Analysis and target design
The phase that settles where the standard is enough and where it is not.
- Fit-to-Standard workshops
- Delta list and solution decisions
- Data migration strategy
- Integration and SAP BTP architecture
- Communication and training plan
Phase 03
Realisation and testing
The busiest phase of the project, where the design becomes a working system.
- Configuration and development cycles
- Data migration rehearsals and reconciliation
- Building SAP BTP extensions
- Integration and user acceptance testing
- Cutover plan and end-user training
Phase 04
Go-live and improvement
The phase where cutover runs and the system settles into operational routine.
- Cutover and go-live
- Hypercare
- Performance and workload monitoring
- Process measurement with SAP Signavio
- Handover to the AMS support model
COMPARISONS
Models and routes side by side
Public, private and on premise
Hosting, upgrades and the split of responsibilities differ across the three models.
| Criterion | PublicSAP S/4HANA Cloud Public Edition | PrivateSAP S/4HANA Cloud Private Edition | On premiseSAP S/4HANA (on premise) |
|---|---|---|---|
| Deployment | Multi-tenant; everyone on the same release | Single-tenant system dedicated to one organisation | The organisation's own system |
| Hosting | SAP operates; SAP picks the infrastructure, the customer the region | SAP operates; SAP data centre, AWS, Azure, Google Cloud or customer data centre | The organisation's data centre or a hyperscaler under its own IaaS contract |
| Customisation | Key user tools, ABAP Cloud (in a three-system landscape) and side-by-side extensions on SAP BTP | The same options plus classic ABAP development; clean core is recommended | Full, including classic ABAP; clean core is recommended |
| Upgrades | Two major releases a year (February, August) with monthly hotfix collections; SAP sets the calendar | The customer picks the timing, SAP performs the technical upgrade; at least once every seven years to stay in mainstream maintenance | Upgrade decision and timing with the organisation; seven years of mainstream maintenance per release |
| Transition route | Greenfield only | Brownfield, greenfield or selective | Brownfield, greenfield or selective |
| Implementation time | Most projects 5-7 months according to SAP; 2-4 months with GROW Fast | 12-21 months depending on the route (SAP indicative durations) | 12-21 months depending on the route (SAP indicative durations) |
| Commercial model | Subscription (GROW with SAP) | Subscription (RISE with SAP) | Software licence and SAP maintenance agreement |
| AI capabilities | Come with the cloud edition | Come with the cloud edition | Selected scenarios only with a commitment to move to the cloud |
| Responsibilities | Infrastructure, operations and releases with SAP; configuration and release testing with the customer | Infrastructure and technical operations with SAP; application management with the customer or a partner | Infrastructure, operations and application management with the organisation or a partner |
| Typical fit | Companies ready for standard processes; GROW is positioned for midsize firms | Companies with deep customisation or industry-specific processes, many coming from ECC | Organisations that must run their own infrastructure or face data residency limits |
Brownfield, greenfield and selective
The decision rests not on one criterion but on how much each of these weighs in your organisation.
| Criterion | System ConversionBrownfield | New ImplementationGreenfield | Selective Data TransitionSelective |
|---|---|---|---|
| Historical data | All of it moves | Does not move; stays in the archive | As much as the selected scope |
| Process change | Limited; improvement planned separately | Extensive; move to the standard | Selective; by business unit |
| Typical duration | 12-15 months | 15-21 months (single wave) | 12-18 months |
| Downtime window | Long; depends on data volume | Short; final data load | Short; can be phased |
| Custom code | Moves after remediation | Re-evaluated | Moves with the selected scope |
| Change management load | Low | High | Medium |
| Typical profile | A company with settled processes that wants to keep its data history | A company redesigning its processes or reshaped by a merger or split | A multi-company group simplifying some units and moving others as they are |
Durations are indicative ranges published by SAP (2024).
Typical duration ranges
For each route, duration falls between the lower and upper bounds SAP gives.
- Brownfield12-15 months
- Greenfield15-21 months · single wave
- Selective12-18 months
- 1Average transition in ASUG research: 1.5 years (Month 18)
Ranges from SAP's planning guide (2024). In ASUG's 2025 research the average transition takes a year and a half; according to Horváth's 2025 study, projects run on average 30 percent longer than planned.
GET STARTED
Which model fits you? We assess it with you.
We review your current SAP landscape, custom development load and regulatory requirements, and map out the deployment model and transition roadmap that fit you.
OUTCOMES FIRST
Business outcomes
- 01
A clear target architecture
A basis for the decision that compares the public and private editions of SAP S/4HANA Cloud against business processes, integration and operating requirements.
- 02
A controlled transition
A workable programme that runs data, development, testing, training and cutover work packages in one roadmap.
- 03
A sustainable core
A measurable SAP platform, open to change through clean-core principles, with technical debt under control.
FOCUS
What do we solve?
Unclear transformation scope
We make the process, development, data and integration dependencies in your current ECC or S/4HANA landscape visible.
The wrong cloud choice
We balance the wish to standardise against the need for flexibility and base the choice between the public and private edition on evidence.
Fragility after go-live
We design the operating model, support, monitoring and continuous improvement before the project closes.
METHOD
How we work
- 01
Discover
SAP Activate's Discover and Prepare phases: we measure the current system with SAP Readiness Check, a simplification item scan and a custom code and add-on inventory, map processes and bottlenecks in joint sessions, and choose the cloud model and transition route on that basis.
- 02
Decide
Explore: we tie scope and downtime strategy, and on the public edition the delta list from the Fit-to-Standard workshops, to concrete decision records.
- 03
Implement
Realize: CVI and custom code remediation, SUM and DMO rehearsals, data migration and reconciliation, integration and acceptance testing run in one delivery plan.
- 04
Safeguard
Deploy and Run: we execute the cutover, watch the system closely through hypercare, and hand the new core over to the AMS support model and an improvement backlog.
COMMON QUESTIONS
Frequently asked questions
How do you decide between SAP S/4HANA Cloud Public Edition and Private Edition?
We decide on how well processes fit the standard, the need for custom development, integration density, regulation, the upgrade model and operating responsibilities. Rather than a single right answer, we build a target model that fits your organisation.
Will all our existing developments be moved?
No. Usage, business value and the option of returning to the standard are analysed; unnecessary code is retired and the differentiation you need is repositioned on clean-core principles.
How is go-live risk reduced?
Repeated data migrations, end-to-end tests, a cutover rehearsal, clear fallback criteria and a task-based hypercare plan run within the same programme.
When does ECC maintenance end?
For SAP ERP 6.0 with EHP 6, 7 and 8, mainstream maintenance ends on 31 December 2027; paid extended maintenance is available until 31 December 2030. Without extended maintenance, or once it ends, the system moves to customer-specific maintenance. For EHP 5 and below, mainstream maintenance ended on 31 December 2025. SAP commits to keeping at least one S/4HANA release in maintenance until 2040.
Can we get shared financial reporting without moving every company at once?
Yes, with SAP Central Finance. Companies keep running their current SAP ERP, S/4HANA or non-SAP systems while FI and CO postings are mapped to shared master data and replicated into one S/4HANA system. Whether the e-Ledger (e-Defter) runs in the source or the central system is decided at project start.
Do we need SAP MDG before moving to SAP S/4HANA?
No. The conversion does not require SAP MDG; it requires customers and suppliers on the business partner (CVI), and per SAP Note 2265093 a system without CVI is declined. SAP suggests MDG consolidation during preparation for a non-redundant master data repository, and central governance before or at go-live to keep the data clean. MDG is licensed separately.
THE COMPLETE JOURNEY
Other areas of expertise
- 01You are hereSAP S/4HANA Consulting
- 02DATA FLOWIntegration Consulting and Architecture
- 03CONTINUITYSAP AMS Support
- 04LOCALIZATIONRollout Project Consulting
- 05FULL CONTROLProject Management Services
- 06DIGITALIZATIONNegzel n-Solutions
- 07CLOUDRISE with SAP
- 08EXPERIENCEOur Expertise
- 09FUTURER&D and Artificial Intelligence
- 10SAP MODULESSAP Consulting
- Home
- SAP S/4HANA Consulting

